megolodon's - Task: Flooring | |
Write up for their project Charlie BOB Conversion | Status: |
Click on images to enlarge - full task gallery at bottom of page
Floor has been treated with anti rust paint, all obstructions removed and any holes filled in.
A lining of foam insulation, then bubble wrap insulation, then another layer of foam.
A sheet of ply was then installed.
I used stick on tiles as I want the easy of replacing and repairing plus was cheap!!
Unfortunately a lot of the tiles have now been damaged during the refurbish. Thankfully it should be easily fixed and mucho cheapness!