ithody's - Task: Water System | |
Write up for their project Building of The Beast ... | Status: |
Click on images to enlarge - full task gallery at bottom of page
Installed a 46 litre fresh water tank (from CAK Tanks) under the van chassis. The external filler point was mounted next to the mains hookup point.
Hot water is provided by a Propex Malaga E boiler in conjunction with a ShurFlo pump. The boiler can run on gas, mains, or both.